iLEC MFM300 Multifunction Power Meter Installation & Setup Guide
Mechanical Installation & Electrical Wiring
- Panel Mounting: Cut a 91×91 mm (or 92×92 mm) cutout, insert the meter, and secure the clips.
- Wiring: Disconnect power first. Connect 180–265 VAC supply, voltage inputs, 5A CTs, and RS485 per the housing diagram.
Parameter Setup Steps
- Network System: Select 3P4W or 3P3W system.
- CT / PT Ratio: Set ratio (1–9999) for accurate readings.
- LCD Display: Choose parameter pages and auto-scroll or fixed mode.
- RS485 Communication: Set Slave ID, baud rate (1.2–38.4 Kbps), and parity to match SCADA/PLC.
↑